I. process flow
Construction preparation, lofting, blanking, welding installation, polishing, weld inspection, polishing.
Ii. Main construction methods:
(1) site lofting shall be carried out before construction, and the lengths of various bars shall be accurately calculated.
(2) the blanking...
Read more